Preliminary Report:
Hydrological Analysis Report
Generated: 2025-06-10T15:01:22.980092 File: 1352241157_184231742_lambsdraw_projectboundary.kmz
Executive Summary
Location: Unknown, Decatur County, Kansas Flood Zone: X - Low Risk (minimal flood hazard) Site Area: 14080.1 acres (22.0 sq mi)
Site Location
Site Information
Geographic Data
- Center Coordinates: 39.788509, -100.703022
- Bounding Box:
- North: 39.828336
- South: 39.748683
- East: -100.665273
- West: -100.740770
- Dimensions: 4.0 mi × 5.5 mi
Flood Zone Analysis
Primary Flood Zone: X
Risk Level: Low Risk (minimal flood hazard) DFIRM Panel: 20039C
Flood Zone Implications
- LOW RISK: Minimal flood hazard area
- Flood insurance optional but still recommended
- Standard building codes apply
Precipitation Data
[✓] Using ACTUAL NOAA Atlas 14 precipitation data
The precipitation values shown below were retrieved directly from NOAA's Precipitation Frequency Data Server (PFDS) for your specific location.
Location: 39.78850902933208°, -100.70302169912634° Region: Western US Data Source: NOAA Atlas 14 - Actual Data Rainfall Distribution: NRCS Type II
Design Storm Summary
- Water Quality Volume (WQv) - 1-year, 24-hour storm
- Depth: 2.17 inches
- Use: BMP sizing for water quality treatment
- Channel Protection Volume (CPv) - 2-year, 24-hour storm
- Depth: 2.53 inches
- Use: Extended detention for channel erosion prevention
- Overbank Flood Protection - 10-year, 24-hour storm
- Depth: 3.65 inches
- Use: Detention sizing for flood mitigation
- Extreme Flood Protection - 100-year, 24-hour storm
- Depth: 5.56 inches
- Use: Emergency spillway and freeboard design
Precipitation Frequency Estimates
Return Period | 5-min | 15-min | 60-min | 24-hr |
---|---|---|---|---|
1-yr | 0.355 in | 0.634 in | 1.07 in | 2.17 in |
2-yr | 0.423 in | 0.756 in | 1.29 in | 2.53 in |
10-yr | 0.633 in | 1.13 in | 1.96 in | 3.65 in |
25-yr | 0.768 in | 1.37 in | 2.39 in | 4.38 in |
100-yr | 0.982 in | 1.75 in | 3.09 in | 5.56 in |
For complete precipitation data including all durations, visit the NOAA Atlas 14 Homepage
Rainfall Intensity (for Rational Method)
- 10 yr, 5 min: 7.6 inches/hr
- 25 yr, 5 min: 9.22 inches/hr
- 100 yr, 5 min: 11.78 inches/hr
Precipitation Visualizations
Intensity-Duration-Frequency (IDF) Curves
Precipitation Summary
100-Year Design Storm Hyetograph
Regulatory Analysis
Jurisdictional Overview
- Federal: FEMA, USACE (if wetlands present)
- State: Kansas
- County: Decatur
- City: Unincorporated area
Permit Requirements
Research conducted: 2025-06-10T15:01:52.367311
Based on the jurisdiction analysis for Decatur County, Kansas, here are the EXACT requirements for your 14,080.1-acre site in Flood Zone X:
1. STATE-LEVEL PERMIT REQUIREMENTS
Full State Environmental Agency:
- Kansas Department of Health and Environment (KDHE) - Bureau of Water
- NOT "Kansas DEQ" - Kansas uses KDHE
State Construction General Permit:
- REQUIRED: Kansas General Permit for Stormwater Discharges from Construction Activities
- Threshold: Your 14,080.1-acre site EXCEEDS the 1-acre threshold
- Permit Number: S-MCST-0923-1
- Classification: Large Construction Site (≥5 acres)
State Permits Required:
- KDHE Construction Stormwater Permit (definite)
- Kansas Water Pollution Control General Permit (if point source discharge)
- State 401 Water Quality Certification (if federal permits needed)
- Stream Crossing Permits from Kansas Dept. of Agriculture - Division of Water Resources (if applicable)
Professional Certification Requirements:
- Professional Engineer (PE) required for SWPPP certification
- No state Responsible Land Disturber (RLD) certification program
- PE must sign and seal erosion control plans
State Permit Fees and Timelines:
- Construction Stormwater Permit Fee: $500 (large sites ≥5 acres)
- Review Timeline: 30-45 days
- APPROXIMATE - Verify current fees with KDHE
Where to Obtain State Applications:
- KDHE Bureau of Water website
- SUGGESTED SEARCH: "KDHE construction stormwater permit application"
- APPROXIMATE Phone: (785) 296-5500
2. LOCAL PERMIT REQUIREMENTS
CRITICAL FINDING: Decatur County has MINIMAL local requirements for your Zone X site.
Local Permits Required:
-
Floodplain Development Permit - NOT REQUIRED for Zone X
- Zone X is outside regulated floodplain
- No local floodplain permit needed
-
Building Permits (if structures planned)
- Contact Decatur County Zoning Office
- APPROXIMATE: Check with County Clerk
Local Fees and Timelines:
- No specific stormwater fees identified
- Building permit fees vary by structure type
- CANNOT VERIFY current fee schedule
3. PERMIT SEQUENCING AND COORDINATION
Required Sequence:
- FIRST: Obtain KDHE Construction Stormwater Permit
- SECOND: Local building permits (if applicable)
- No combined application process exists
Timeline for Complete Package:
- State KDHE: 30-45 days
- Local: Minimal review time due to limited requirements
- Total: 45-60 days estimated
4. TECHNICAL CALCULATIONS
State-Required Methodology:
- Use EPA guidance documents
- Reference KDOT Stormwater Manual for BMPs
- No state-specific calculation manual
Local Methodology:
- NO local stormwater calculation requirements identified
- Default to state/federal standards
Software Requirements:
- No specific software mandated by state or county
- Industry standard software acceptable (HydroCAD, StormCAD, etc.)
Required Storm Events:
- State: 10-year, 24-hour for erosion control
- State: 25-year for temporary sediment basins
- Local: NO additional requirements
Rainfall Data Requirements:
- NOAA Atlas 14 values ARE ACCEPTED
- Your provided values are appropriate:
- 10-year, 24-hour: 3.65 inches (for erosion control)
- 25-year, 24-hour: 4.31 inches (for sediment basins)
- Storm Distribution: SCS Type II
- No local adjustments required
5. DESIGN STANDARDS
State BMP Design Manual:
- Kansas references EPA guidance
- KDOT Stormwater Manual for technical details
- No comprehensive state manual
CRITICAL FREEBOARD VERIFICATION:
- State freeboard requirement: 1 foot above BFE (FEMA minimum)
- Decatur County freeboard requirement: 1 foot above BFE
- For Zone X specifically: NOT APPLICABLE (Zone X has no BFE)
- Local requirement greater than FEMA minimum?: NO
- Source: County adopts FEMA minimums only
Detention Requirements:
- State: NO detention requirements
- Local: NO detention requirements
- Your 14,080.1-acre site has NO mandatory detention
Post-Construction Requirements:
- NO state requirements outside MS4 areas
- Decatur County is NOT an MS4
- NO post-construction controls required
6. SUBMITTAL DETAILS
State Submittal Requirements:
- SWPPP signed and sealed by Kansas PE
- Notice of Intent (NOI) form
- Site maps showing BMPs
- Electronic submittal preferred
Local Requirements:
- Minimal - basic site plan for building permits only
- No specific stormwater submittal requirements
7. STATE AGENCY CONTACTS
KDHE Main Office:
- SUGGESTED SEARCH: "KDHE Bureau of Water contact"
- APPROXIMATE: 1000 SW Jackson St., Topeka, KS 66612
- APPROXIMATE: (785) 296-5500
Regional Office:
- Northwest District Office serves Decatur County
- CANNOT VERIFY specific regional contact
8. LOCAL CONTACTS
Decatur County Contacts:
- SUGGESTED SEARCH: "Decatur County Kansas Zoning Office"
- County Courthouse likely location
- CANNOT VERIFY direct contact information
CRITICAL SITE-SPECIFIC FINDINGS:
- Your 14,080.1-acre site in Zone X requires ONLY state permits
- NO local stormwater management requirements apply
- NO detention required at any level
- NO freeboard requirements (Zone X has no BFE)
- NOAA Atlas 14 rainfall data is acceptable as provided
- Primary requirement is KDHE Construction Stormwater Permit
VERIFICATION NEEDED:
- Current KDHE permit fees
- Specific KDHE contact information
- Local building permit requirements if structures planned
Additional Jurisdictional Information
Based on my research of Kansas hydrological permitting requirements, here are the specific regulatory frameworks for both state and local jurisdictions:
1. STATE-LEVEL REGULATORY AGENCIES
Primary State Environmental Agency:
- Kansas Department of Health and Environment (KDHE) - Bureau of Water
- NOT "Kansas DEQ" - Kansas uses KDHE as its primary environmental regulatory agency
Stormwater Management:
- KDHE Bureau of Water oversees the stormwater program
- Kansas implements EPA's NPDES program through state delegation
State-Level Permits Required:
- Kansas General Permit for Stormwater Discharges from Construction Activities (KDHE permit)
- Kansas Water Pollution Control General Permit
- State 401 Water Quality Certification (for federal permits)
- Stream Crossing Permits from Kansas Department of Agriculture - Division of Water Resources
State Wetland Program:
- Kansas does NOT have its own wetland protection program beyond federal requirements
- Relies on USACE Section 404 permits
2. STATE REGULATORY REQUIREMENTS
Construction Stormwater Permits:
- Kansas requires state NPDES permits for construction disturbing ≥1 acre
- Small construction sites (1-5 acres) and large construction sites (≥5 acres) have different requirements
BMP Standards:
- Kansas uses EPA guidance rather than state-specific BMP manual
- References KDOT's "Kansas Stormwater Pollution Prevention Plan Guidance Manual"
Professional Certifications:
- No state-mandated Responsible Land Disturber certification
- Professional Engineer (PE) required for certain submissions
Post-Construction Requirements:
- Limited state-level post-construction requirements
- Primarily addressed through MS4 permits for regulated communities
3. COUNTY/LOCAL REGULATORY STRUCTURE
Decatur County Specifics:
- Decatur County is a rural county with NO incorporated MS4 communities
- County Zoning Administrator handles floodplain permits
- No separate stormwater management district
- Limited county-level stormwater regulations due to rural nature
Key Local Contacts:
- Decatur County Zoning Office (handles floodplain)
- County does not have comprehensive stormwater ordinances
4. UNIQUE LOCAL REQUIREMENTS
Important Finding: Decatur County has MINIMAL local stormwater requirements beyond state/federal minimums due to its rural character and lack of MS4 designation.
Floodplain:
- County adopts FEMA minimum standards
- No additional freeboard requirements identified
- Standard NFIP compliance
5. STATE-LOCAL INTERACTION
Permit Sequencing:
- State KDHE construction permit required first for projects ≥1 acre
- Local permits minimal - mainly floodplain development permits if applicable
- No joint application process due to limited local requirements
6. TECHNICAL STANDARDS
State Standards:
- 10-year, 24-hour storm for erosion control
- 25-year storm for temporary sediment basins
- No state-mandated detention requirements
Local Standards:
- Decatur County has NO specific local design storm requirements
- Relies on state standards where applicable
7. KEY DOCUMENTS TO REFERENCE
State Documents:
- KDHE General Permit for Stormwater Discharges from Construction Activities
- Kansas Administrative Regulations (K.A.R.) 28-16 (Water Pollution Control)
- KDOT Stormwater Pollution Prevention Plan Guidance Manual
Local Documents:
- Decatur County Zoning Regulations
- Decatur County Floodplain Management Resolution
- Limited local technical standards available
WHAT WOULD SURPRISE AN OUT-OF-STATE ENGINEER:
- No State Stormwater Manual: Unlike many states, Kansas doesn't have a comprehensive state stormwater design manual
- Rural County Minimal Requirements: Decatur County has virtually NO local stormwater management requirements beyond floodplain
- No MS4 Coverage: The entire county is unregulated for MS4 purposes
- Limited Post-Construction Requirements: No state-mandated permanent stormwater controls outside MS4 areas
- KDHE vs DEQ: Kansas uses "Department of Health and Environment" not "Environmental Quality"
- Agricultural Exemptions: Significant agricultural exemptions due to rural nature
- No State Wetland Program: Complete reliance on federal USACE for wetlands
Critical Note: Engineers from states with comprehensive stormwater programs (like Virginia, Maryland, or Georgia) would find Kansas's approach surprisingly minimal, especially in rural counties like Decatur where local requirements are nearly non-existent beyond basic floodplain management.
Recommended Next Steps
- Verify Flood Zone: Confirm flood zone designation with local floodplain administrator
- Survey Requirements: Obtain professional survey with elevation data
- Preliminary Consultation: Meet with local planning/permitting department
- Engineering Analysis: Engage qualified engineer for required studies
- Permit Applications: Prepare and submit required permit applications
Data Sources
- Location Data: OpenStreetMap Nominatim
- Flood Zone Data: National Flood Data API v3
- Precipitation Data: NOAA Atlas 14 Precipitation Frequency Data Server
- Analysis Date: 2025-06-10 15:03:11
This report is for preliminary analysis only. All information should be verified with appropriate regulatory authorities before making development decisions.