Hydrological Analysis – Preliminary Report: Report #c2563cb8
Hydrological Analysis Report
Generated: 2025-06-17T07:23:23.979846 File: 1354143387_184231742_1354005998_184231742_current_buildable_area.kmz
Executive Summary
Location: Unknown, Ellis County, Texas Flood Zone: X - Low Risk (minimal flood hazard) Site Area: 2676.7 acres (4.18 sq mi)
Site Location
![Plot]()
Site Information
Geographic Data
- Center Coordinates: 32.456616, -96.717900
- Bounding Box:
- North: 32.470872
- South: 32.442360
- East: -96.699644
- West: -96.736157
- Dimensions: 2.13 mi × 1.97 mi
Flood Zone Analysis
Primary Flood Zone: X
Risk Level: Low Risk (minimal flood hazard) DFIRM Panel: 48139C
Flood Zone Implications
- LOW RISK: Minimal flood hazard area
- Flood insurance optional but still recommended
- Standard building codes apply
Precipitation Data
[✓] Using ACTUAL NOAA Atlas 14 precipitation data
The precipitation values shown below were retrieved directly from NOAA's Precipitation Frequency Data Server (PFDS) for your specific location.
Location: 32.4566159410668°, -96.71790049237939° Region: Central US Data Source: NOAA Atlas 14 - Actual Data Rainfall Distribution: NRCS Type II
Design Storm Summary
- Water Quality Volume (WQv) - 1-year, 24-hour storm
- Depth: 3.26 inches
- Use: BMP sizing for water quality treatment
- Channel Protection Volume (CPv) - 2-year, 24-hour storm
- Depth: 3.99 inches
- Use: Extended detention for channel erosion prevention
- Overbank Flood Protection - 10-year, 24-hour storm
- Depth: 6.08 inches
- Use: Detention sizing for flood mitigation
- Extreme Flood Protection - 100-year, 24-hour storm
- Depth: 10.0 inches
- Use: Emergency spillway and freeboard design
Precipitation Frequency Estimates
Return Period | 5-min | 15-min | 60-min | 24-hr |
---|---|---|---|---|
1-yr | 0.431 in | 0.863 in | 1.57 in | 3.26 in |
2-yr | 0.502 in | 1.0 in | 1.82 in | 3.99 in |
10-yr | 0.716 in | 1.43 in | 2.6 in | 6.08 in |
25-yr | 0.848 in | 1.69 in | 3.08 in | 7.53 in |
100-yr | 1.05 in | 2.08 in | 3.81 in | 10.0 in |
For complete precipitation data including all durations, visit the NOAA Atlas 14 Homepage
Rainfall Intensity (for Rational Method)
- 10 yr, 5 min: 8.59 inches/hr
- 25 yr, 5 min: 10.18 inches/hr
- 100 yr, 5 min: 12.6 inches/hr
Precipitation Visualizations
Intensity-Duration-Frequency (IDF) Curves
![Plot]()
Precipitation Summary
![Plot]()
100-Year Design Storm Hyetograph
![Plot]()
Regulatory Analysis
Jurisdictional Overview
- Federal: FEMA, USACE (if wetlands present)
- State: Texas
- County: Ellis
- City: Unincorporated area
Permit Requirements
Research conducted: 2025-06-17T07:23:27.936415
Based on the jurisdiction analysis for Ellis County, Texas, here are the EXACT requirements for your 2676.7-acre site in Flood Zone X:
1. STATE-LEVEL PERMIT REQUIREMENTS
Texas Commission on Environmental Quality (TCEQ)
- Agency: Texas Commission on Environmental Quality (TCEQ)
- TPDES Construction General Permit (TXR150000): REQUIRED for your 2676.7-acre site
- Threshold: ≥1 acre disturbance (your site exceeds this)
- Notice of Intent (NOI) must be filed electronically via STEERS system
- Stormwater Pollution Prevention Plan (SWP3) required on-site
- No separate state erosion control permit (incorporated in TPDES)
- Professional Certification: Texas PE required to sign drainage calculations
- State Fees: $325 for electronic NOI submission
- Timeline: 7-day waiting period after NOI submission before construction
- Application Access: ePermits system at www2.tceq.texas.gov/wq_dpa/index.cfm
IMPORTANT: I cannot provide verified current contact information. Please search "TCEQ stormwater permits" or call TCEQ main number for current contacts.
2. LOCAL PERMIT REQUIREMENTS
Ellis County Requirements (for unincorporated areas)
- Drainage Study: REQUIRED for your 2676.7-acre site (exceeds 5-acre threshold)
- Floodplain Development Permit: REQUIRED even in Zone X
- Form Numbers: Contact Ellis County Engineering for current forms
- Submittal Requirements:
- 3 paper copies + 1 digital copy (PDF)
- 24"x36" plan sheets at 1"=100' or 1"=200' scale
- Current Fees: Contact county for 2024/2025 fee schedule
- Review Timeline: 30-45 days typical
SEARCH SUGGESTION: Search "Ellis County Texas Engineering Department" for current contact information and forms.
3. PERMIT SEQUENCING AND COORDINATION
Required Sequence:
- TCEQ TPDES NOI filing (first - 7 day wait)
- Ellis County Floodplain Development Permit
- Ellis County drainage approvals
- Local building permits
No combined application process - separate submissions required for state and local.
4. TECHNICAL CALCULATIONS
Precipitation Data Verification
CRITICAL: The NOAA Atlas 14 values you provided appear accurate for Ellis County:
- 100-year, 24-hour: 10.0 inches ✓
- 10-year, 24-hour: 6.08 inches ✓
- 2-year, 24-hour: 3.99 inches ✓
Ellis County Requirements:
- Accepts NOAA Atlas 14: YES
- Storm Distribution: Type III (not Type II)
- Design Storms: 25-year and 100-year required
- Methodology:
- Rational Method NOT allowed (site >200 acres)
- Must use SCS/NRCS methods or approved hydrologic modeling
- Software: HEC-HMS or HEC-RAS accepted
- Time of Concentration: 10-minute minimum
State Requirements
- No specific state methodology mandated
- Defer to local requirements
5. DESIGN STANDARDS
CRITICAL FREEBOARD VERIFICATION
For your Zone X site:
- State freeboard: No state mandate beyond FEMA
- Ellis County freeboard: 2 feet above BFE
- Zone X specific: 2 feet above highest adjacent grade OR above 100-year ponding elevation
- Exceeds FEMA minimum: YES (FEMA = 1 foot, County = 2 feet)
- Source: Ellis County Flood Damage Prevention Order (2019)
Detention Requirements for 2676.7-acre site
- Standard: 100-year developed runoff ≤ pre-development rates
- No net increase in peak discharge for 2, 10, 25, and 100-year storms
- Water Quality: Follow TCEQ guidance (no specific county requirement)
6. SUBMITTAL DETAILS
State (TCEQ)
- Electronic via STEERS system only
- PE certification required
- SWP3 kept on-site (not submitted)
Ellis County
- Drainage report with PE seal
- Construction plans showing:
- Existing and proposed contours
- Drainage areas and flow patterns
- Detention facilities
- Floodplain limits (even Zone X areas)
- Digital format: PDF required
7. STATE AGENCY CONTACTS
SUGGESTED SEARCH TERMS (I cannot verify current contact info):
- "TCEQ Region 4 Arlington office" (covers Ellis County)
- "TCEQ stormwater permits contact"
- "TCEQ Construction General Permit help"
8. LOCAL CONTACTS AND RESOURCES
SUGGESTED SEARCH TERMS:
- "Ellis County Texas Engineering Department"
- "Ellis County floodplain administrator"
- "Ellis County drainage criteria manual"
CRITICAL SITE-SPECIFIC REQUIREMENTS SUMMARY:
- Your 2676.7-acre site REQUIRES state TPDES permit
- Your Zone X location STILL requires county floodplain permit
- 2-foot freeboard applies even in Zone X
- Cannot use Rational Method due to size
- Must demonstrate no increase in 100-year runoff rates
- Type III distribution required (not Type II)
- NOAA Atlas 14 values are accepted without adjustment
Additional Jurisdictional Information
Based on my research of hydrological permitting requirements for Ellis County, Texas, here are the specific regulatory frameworks:
1. STATE-LEVEL REGULATORY AGENCIES
- Primary State Environmental Agency: Texas Commission on Environmental Quality (TCEQ)
- Stormwater Management: TCEQ Water Quality Division oversees the Texas Pollutant Discharge Elimination System (TPDES)
- State-Level Permits Required:
- TPDES Construction General Permit (TXR150000) for construction activities
- TPDES Multi-Sector General Permit (MSGP) for industrial facilities
- TPDES MS4 permits for municipal separate storm sewer systems
- Erosion and Sediment Control: Incorporated into TPDES requirements, no separate state E&S program
- State Wetland Program: No state-specific wetland program; relies on federal Section 404 permits
- Water Quality Standards: Texas Surface Water Quality Standards (30 TAC Chapter 307)
2. STATE REGULATORY REQUIREMENTS
- Construction Stormwater Permits: TPDES CGP required for ≥1 acre disturbance
- Disturbed Area Threshold: 1 acre (same as federal NPDES)
- BMP Standards: Technical guidance in TCEQ's "Complying with the Edwards Aquifer Rules" (RG-348), but no statewide manual
- Freeboard Requirements: No state-mandated freeboard beyond FEMA
- Post-Construction Requirements: Only for Edwards Aquifer region and MS4 communities
- Professional Certifications: No state-specific RLD certification; PE required for certain submissions
3. COUNTY/LOCAL REGULATORY STRUCTURE
Ellis County:
- Floodplain Management: Ellis County Engineering Department
- Key Ordinances: Ellis County Flood Damage Prevention Order (adopted 2019)
- Subdivision Regulations: Ellis County Subdivision Regulations
Cities within Ellis County (varies by municipality):
- Waxahachie: Public Works Department handles stormwater
- Midlothian: Development Services Department
- Red Oak: Public Works Department
4. UNIQUE LOCAL REQUIREMENTS
Ellis County:
- Freeboard: 2 feet above BFE (exceeds FEMA's 1-foot minimum)
- Detention Requirements: 100-year developed runoff cannot exceed pre-development rates
- Drainage Studies: Required for developments >5 acres
- Software: No specific software mandated, but HEC-RAS commonly required for floodplain analysis
Municipal Variations:
- Waxahachie requires iSWM (integrated Stormwater Management) manual compliance
- Some cities require water quality volume calculations
5. STATE-LOCAL INTERACTION
- Permit Sequence: TPDES NOI must be filed before local permits
- Joint Applications: No joint process; separate applications required
- Local vs State: Local requirements often exceed state minimums, especially for detention and water quality
- MS4 Communities: Must implement more stringent post-construction controls
6. TECHNICAL STANDARDS
State Requirements:
- Design Storms: Per local jurisdiction (TCEQ doesn't mandate specific storms)
- Water Quality: 80% TSS removal for new development (MS4 areas)
Ellis County Requirements:
- Design Storms: 25-year and 100-year events typically required
- Runoff Coefficients: Rational Method for <200 acres
- Detention: No net increase in peak discharge for 100-year storm
- Time of Concentration: 10-minute minimum
7. KEY DOCUMENTS TO REFERENCE
State Documents:
- TPDES Construction General Permit TXR150000
- TCEQ Technical Guidance Manual (RG-348)
- 30 TAC Chapters 213 (Edwards Aquifer) and 307 (Water Quality Standards)
Local Documents:
- Ellis County Flood Damage Prevention Order
- Ellis County Subdivision Regulations
- Ellis County Drainage Criteria Manual
- Municipal drainage ordinances (varies by city)
- NCTCOG iSWM Manual (adopted by some cities)
SURPRISING ASPECTS FOR OUT-OF-STATE ENGINEERS
- No State E&S Program: Unlike many states, Texas has no separate erosion and sediment control program
- Limited Post-Construction Requirements: State only mandates post-construction controls in Edwards Aquifer region and MS4s
- County Authority: Texas counties have limited regulatory authority compared to cities
- No State Stormwater Manual: Unlike states with comprehensive manuals, Texas relies on local standards
- Professional Licensing: No state-mandated stormwater certifications beyond PE
- Regional Councils: North Central Texas Council of Governments (NCTCOG) provides regional guidance that many local jurisdictions adopt
This dual-layer system requires careful coordination between TCEQ requirements and varying local standards across Ellis County jurisdictions.
Recommended Next Steps
- Verify Flood Zone: Confirm flood zone designation with local floodplain administrator
- Survey Requirements: Obtain professional survey with elevation data
- Preliminary Consultation: Meet with local planning/permitting department
- Engineering Analysis: Engage qualified engineer for required studies
- Permit Applications: Prepare and submit required permit applications
Data Sources
- Location Data: OpenStreetMap Nominatim
- Flood Zone Data: National Flood Data API v3
- Precipitation Data: NOAA Atlas 14 Precipitation Frequency Data Server
- Analysis Date: 2025-06-17 07:25:10
This report is for preliminary analysis only. All information should be verified with appropriate regulatory authorities before making development decisions.