Hydrological Analysis – Preliminary Report: Report #2e80d4f9
Hydrological Analysis Report
Generated: 2025-09-17T14:55:06.271849 File: 1381684648_184231742_property_line.shp.kmz
Executive Summary
Location: Unknown, Macoupin County, Illinois Flood Zone: C - Low Risk (minimal flood hazard) Site Area: 83.3 acres (0.13 sq mi)
Site Location
Site Information
Geographic Data
- Center Coordinates: 39.490062, -89.783421
- Bounding Box:
- North: 39.493726
- South: 39.486397
- East: -89.781004
- West: -89.785838
- Dimensions: 0.26 mi × 0.51 mi
Flood Zone Analysis
Primary Flood Zone: C
Risk Level: Low Risk (minimal flood hazard) DFIRM Panel: 17117C
Flood Zone Implications
- LOW RISK: Minimal flood hazard area
- Flood insurance optional but still recommended
- Standard building codes apply
Precipitation Data
[✓] Using ACTUAL NOAA Atlas 14 precipitation data
The precipitation values shown below were retrieved directly from NOAA's Precipitation Frequency Data Server (PFDS) for your specific location.
Location: 39.49006169977109°, -89.78342055407427° Region: Eastern US Data Source: NOAA Atlas 14 - Actual Data Rainfall Distribution: NRCS Type II
Design Storm Summary
- Water Quality Volume (WQv) - 1-year, 24-hour storm
- Depth: 2.47 inches
- Use: BMP sizing for water quality treatment
- Channel Protection Volume (CPv) - 2-year, 24-hour storm
- Depth: 2.98 inches
- Use: Extended detention for channel erosion prevention
- Overbank Flood Protection - 10-year, 24-hour storm
- Depth: 4.31 inches
- Use: Detention sizing for flood mitigation
- Extreme Flood Protection - 100-year, 24-hour storm
- Depth: 6.36 inches
- Use: Emergency spillway and freeboard design
Precipitation Frequency Estimates
| Return Period | 5-min | 15-min | 60-min | 24-hr |
|---|---|---|---|---|
| 1-yr | 0.397 in | 0.756 in | 1.22 in | 2.47 in |
| 2-yr | 0.473 in | 0.903 in | 1.48 in | 2.98 in |
| 10-yr | 0.634 in | 1.2 in | 2.13 in | 4.31 in |
| 25-yr | 0.723 in | 1.37 in | 2.5 in | 5.1 in |
| 100-yr | 0.865 in | 1.62 in | 3.12 in | 6.36 in |
For complete precipitation data including all durations, visit the NOAA Atlas 14 Homepage
Rainfall Intensity (for Rational Method)
- 10 yr, 5 min: 7.61 inches/hr
- 25 yr, 5 min: 8.68 inches/hr
- 100 yr, 5 min: 10.38 inches/hr
Precipitation Visualizations
Intensity-Duration-Frequency (IDF) Curves
Precipitation Summary
100-Year Design Storm Hyetograph
Regulatory Analysis
Jurisdictional Overview
- Federal: FEMA, USACE (if wetlands present)
- State: Illinois
- County: Macoupin
- City: Unincorporated area
Permit Requirements
Research conducted: 2025-09-17T14:55:10.181812
Based on the jurisdiction analysis for Macoupin County, Illinois, here are the EXACT requirements for your 83.3-acre site in Zone C:
1. STATE-LEVEL PERMIT REQUIREMENTS
Illinois Environmental Protection Agency (IEPA)
Required State Permits for 83.3-acre Site:
- NPDES ILR10 General Stormwater Permit - REQUIRED (site exceeds 1-acre threshold)
- Application: Notice of Intent (NOI) Form
- Fee: $400 (as of 2024)
- Timeline: 30-day review period
- Download: Search "IEPA NPDES ILR10 NOI" on Illinois EPA website
State Thresholds Triggering Requirements:
- Construction stormwater permit: ≥1 acre disturbance (YOUR SITE REQUIRES)
- No separate state stormwater management permit exists
- No state erosion control permit (covered under NPDES)
- No state wetland permits (relies on federal Section 404)
Professional Certifications:
- Professional Engineer (PE) required for NPDES permit drawings
- No state-specific stormwater certifications required
- No Registered Landscape Designer (RLD) program in Illinois
CONTACT INFORMATION (APPROXIMATE - Please verify):
- IEPA Bureau of Water: 217-782-3362
- Regional Office (Region 4 - includes Macoupin): Search "IEPA Region 4 Office"
- NPDES Permits: Search "IEPA NPDES stormwater permits"
2. LOCAL PERMIT REQUIREMENTS
Macoupin County Requirements for 83.3-acre Site in Zone C:
Required Local Permits:
- Floodplain Development Permit - NOT REQUIRED for Zone C
- Zone C is outside the 100-year floodplain
- Chapter 40 of County Code only regulates Zones A, AE, AH, AO
- Subdivision Approval - MAY BE REQUIRED if creating new lots
- Chapter 55 of County Code
- Contact Planning Department to confirm
- Building Permits - Required for structures
- Zoning Compliance - Verify zoning district requirements
Local Submittal Requirements:
- Number of copies: Typically 3 paper sets (VERIFY with county)
- Format: 24"x36" plan sheets typical
- Scale: 1"=100' or larger for site plans
CONTACT INFORMATION (APPROXIMATE - Please verify):
- Macoupin County Planning & Economic Development
- Phone: Search "Macoupin County Planning Department"
- Address: 215 S. East Street, Carlinville, IL 62626
3. PERMIT SEQUENCING AND COORDINATION
Required Sequence:
- FIRST: IEPA NPDES ILR10 permit (file NOI)
- SECOND: County permits (if subdivision or building)
- No combined applications available
- State and local reviews are independent
Timeline:
- IEPA NPDES: 30 days from complete NOI
- County permits: Varies (contact county for current timelines)
4. TECHNICAL CALCULATIONS
State Requirements (IEPA):
- Methodology: No specific state-mandated methodology
- Software: No specific software required by state
- Storm Events: Follow local requirements
Local Requirements (Macoupin County):
- Methodology for 83.3 acres: SCS/NRCS methods required (>40 acres)
- Software: No specific software mandated
- Design Storms:
- 10-year, 24-hour for conveyance design
- 100-year, 24-hour for overflow routes
Precipitation Data:
CRITICAL VERIFICATION NEEDED: Contact Macoupin County to confirm if NOAA Atlas 14 values are accepted:
- 100-year, 24-hour: 6.36 inches
- 10-year, 24-hour: 4.31 inches
- Storm distribution: Type II (typical for Illinois)
5. DESIGN STANDARDS
State BMP Standards:
- Illinois Urban Manual (IUM) - GUIDANCE ONLY, not mandatory
- No state-mandated detention requirements
- No state water quality volume requirements
Local Standards for Zone C:
CRITICAL FREEBOARD VERIFICATION:
- State freeboard requirement: NONE beyond FEMA
- Macoupin County freeboard requirement: 1 foot above BFE
- For Zone C specifically: NOT APPLICABLE (Zone C has no BFE)
- Is local requirement GREATER than FEMA minimum? NO (follows FEMA)
- Source: Chapter 40, Macoupin County Code
Detention Requirements:
- No formal county detention ordinance
- Agricultural drainage tiles must be maintained if impacted
6. SUBMITTAL DETAILS
State Submittal (IEPA):
- Electronic submittal via IEPA website
- PE certification required on plans
- SWPPP required with NOI
Local Submittal:
- Paper copies (verify number with county)
- PE stamp typically required for engineering plans
- No specific plan sheet order mandated
7. STATE AGENCY CONTACTS
APPROXIMATE INFORMATION - Please verify current contacts:
- IEPA Main Office: 217-782-3362
- Search "IEPA Bureau of Water NPDES permits"
- Search "IEPA Region 4 office" for regional contact
8. LOCAL CONTACTS AND RESOURCES
APPROXIMATE INFORMATION - Please verify:
- Search "Macoupin County Planning Department"
- Search "Macoupin County floodplain administrator"
- County website: macoupincountyil.gov
CRITICAL ACTIONS FOR YOUR 83.3-ACRE ZONE C SITE:
- File IEPA NPDES ILR10 NOI (definite requirement)
- Verify with county if subdivision approval needed
- Confirm NOAA Atlas 14 precipitation data acceptance
- Use SCS/NRCS methodology for calculations (>40 acres)
- No floodplain permit needed for Zone C
Additional Jurisdictional Information
Based on my research of hydrological permitting requirements for Macoupin County, Illinois:
1. STATE-LEVEL REGULATORY AGENCIES
- Primary Agency: Illinois Environmental Protection Agency (IEPA)
- Stormwater Division: IEPA Bureau of Water, specifically the Watershed Management Section
- State Permits Required:
- NPDES ILR10 (General Stormwater Permit for Construction)
- NPDES ILR40 (Industrial Stormwater Permit)
- Section 401 Water Quality Certification
- Joint Permit Application with USACE for wetlands
- Erosion Control: No standalone state E&SC program - handled through NPDES
- Wetland Program: Illinois has no independent state wetland program; relies on federal Section 404
- Water Quality: Illinois follows EPA-approved water quality standards under 35 Ill. Adm. Code Part 302
2. STATE REGULATORY REQUIREMENTS
- Construction Permits: NPDES ILR10 required for ≥1 acre disturbance
- Threshold: 1 acre (following federal minimum)
- BMP Standards: Illinois Urban Manual (IUM) provides design guidance but is not mandatory statewide
- Freeboard: No state-mandated freeboard beyond FEMA requirements
- Post-Construction: No statewide post-construction standards (delegated to locals)
- Certifications: No state-specific RLD or similar program; PE required for certain submissions
3. COUNTY/LOCAL REGULATORY STRUCTURE
- Macoupin County:
- Planning and Economic Development Department handles floodplain permits
- No separate stormwater management district exists
- Floodplain Ordinance (Chapter 40 of County Code)
- Municipalities: Cities like Carlinville may have additional requirements
- Key Ordinances:
- Macoupin County Floodplain Ordinance
- Subdivision Regulations (Chapter 55)
- Zoning Ordinance (Chapter 90)
4. UNIQUE LOCAL REQUIREMENTS
- Freeboard: County requires 1 foot above BFE (FEMA minimum)
- Calculation Methods: Rational Method for <40 acres; SCS/NRCS methods for larger areas
- Software: No specific software mandated
- Design Standards: County relies on IDOT Drainage Manual for public projects
5. STATE-LOCAL INTERACTION
- Permit Sequence: IEPA NPDES permit typically obtained before local permits
- No Joint Applications: State and local permits are separate processes
- Local Standards: Counties can exceed state minimums but Macoupin County generally follows state standards
- Coordination: Limited formal coordination between state and county
6. TECHNICAL STANDARDS
State Requirements:
- 10-year, 24-hour storm for conveyance
- 100-year for floodplain analysis
- No specific state detention requirements
Local Requirements:
- 10-year design storm for drainage systems
- 100-year for overflow routes
- No formal detention ordinance in Macoupin County
- Agricultural drainage tiles must be maintained/replaced if impacted
7. KEY DOCUMENTS TO REFERENCE
- IEPA NPDES General Permit ILR10
- Illinois Urban Manual (IUM) - guidance document
- IDOT Drainage Manual
- Macoupin County Code Chapter 40 (Floodplain)
- Macoupin County Code Chapter 55 (Subdivision)
- IEPA Notice of Intent (NOI) forms
- County floodplain development permit application
SURPRISES FOR OUT-OF-STATE ENGINEERS
- No State Stormwater Management Act: Unlike neighboring states (Wisconsin, Indiana), Illinois has no comprehensive state stormwater law
- Weak Post-Construction Requirements: No statewide post-construction stormwater standards
- Limited County Authority: Macoupin County has minimal stormwater regulations beyond floodplain management
- Agricultural Exemptions: Extensive agricultural drainage exemptions due to Illinois Drainage Code
- No State Wetland Program: Complete reliance on federal Section 404 permitting
- Minimal Professional Certifications: No state-specific erosion control or stormwater inspector certifications required
- Drainage Districts: Historic drainage districts may have authority over certain areas, creating additional jurisdictional complexity
The regulatory framework in Macoupin County is notably less stringent than many other states, with minimal county-level stormwater management requirements beyond basic floodplain regulations.
Recommended Next Steps
- Verify Flood Zone: Confirm flood zone designation with local floodplain administrator
- Survey Requirements: Obtain professional survey with elevation data
- Preliminary Consultation: Meet with local planning/permitting department
- Engineering Analysis: Engage qualified engineer for required studies
- Permit Applications: Prepare and submit required permit applications
Data Sources
- Location Data: OpenStreetMap Nominatim
- Flood Zone Data: National Flood Data API v3
- Precipitation Data: NOAA Atlas 14 Precipitation Frequency Data Server
- Analysis Date: 2025-09-17 14:56:26
This report is for preliminary analysis only. All information should be verified with appropriate regulatory authorities before making development decisions.