Hydrological Analysis – Preliminary Report: Wharton County, TX
Hydrological Analysis Report
Generated: 2025-09-08T14:02:55.719608
File: texas_wharton_20250908_140254.kml
Executive Summary
Location: Unknown, Wharton County, Texas
Flood Zone: AE - High Risk - Special Flood Hazard Area (1% annual chance)
Site Area: 100.0 acres (0.16 sq mi)
Site Location

Site Information
Geographic Data
- Center Coordinates: 29.298462, -96.107424
- Bounding Box:
- North: 29.301327
- South: 29.295598
- East: -96.104139
- West: -96.110708
- Dimensions: 0.4 mi × 0.4 mi
Flood Zone Analysis
Primary Flood Zone: AE
Risk Level: High Risk - Special Flood Hazard Area (1% annual chance)
DFIRM Panel: 48481C
Flood Zone Implications
- ⚠️ HIGH RISK: Property is in Special Flood Hazard Area (SFHA)
- Flood insurance is MANDATORY for federally-backed mortgages
- Floodplain development permit required for any construction
Precipitation Data
✅ Using ACTUAL NOAA Atlas 14 precipitation data
The precipitation values shown below were retrieved directly from NOAA's
Precipitation Frequency Data Server (PFDS) for your specific location.
Verify data at: https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?lat=29.2985&lon=-96.1074
Location: 29.2984625°, -96.10742350000001°
Region: Southeast US
Data Source: NOAA Atlas 14 - Actual Data
Design Storm Summary
- Water Quality Volume (WQv) - 1-year, 24-hour storm
- Depth: 3.73 inches
- Use: BMP sizing for water quality treatment
- Channel Protection Volume (CPv) - 2-year, 24-hour storm
- Depth: 4.86 inches
- Use: Extended detention for channel erosion prevention
- Overbank Flood Protection - 10-year, 24-hour storm
- Depth: 8.02 inches
- Use: Detention sizing for flood mitigation
- Extreme Flood Protection - 100-year, 24-hour storm
- Depth: 14.7 inches
- Use: Emergency spillway and freeboard design
Precipitation Frequency Estimates
Return Period | 5-min | 10-min | 15-min | 30-min | 60-min | 2-hr | 3-hr | 6-hr | 12-hr | 24-hr | 2-day | 3-day | 7-day | 10-day |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1-yr | 0.501 in | 0.795 in | 1.01 in | 1.43 in | 1.89 in | 2.32 in | 2.56 in | 2.97 in | 3.34 in | 3.73 in | 4.15 in | 4.49 in | 5.6 in | 6.25 in |
2-yr | 0.578 in | 0.919 in | 1.16 in | 1.64 in | 2.18 in | 2.75 in | 3.1 in | 3.7 in | 4.27 in | 4.86 in | 5.52 in | 5.97 in | 7.16 in | 7.85 in |
5-yr | 0.706 in | 1.12 in | 1.41 in | 1.99 in | 2.66 in | 3.44 in | 3.94 in | 4.79 in | 5.61 in | 6.48 in | 7.44 in | 8.08 in | 9.51 in | 10.3 in |
10-yr | 0.81 in | 1.29 in | 1.62 in | 2.28 in | 3.05 in | 4.02 in | 4.67 in | 5.79 in | 6.87 in | 8.02 in | 9.3 in | 10.1 in | 11.6 in | 12.5 in |
25-yr | 0.953 in | 1.52 in | 1.9 in | 2.66 in | 3.59 in | 4.85 in | 5.72 in | 7.25 in | 8.76 in | 10.3 in | 12.1 in | 13.1 in | 14.8 in | 15.7 in |
50-yr | 1.06 in | 1.7 in | 2.11 in | 2.94 in | 3.99 in | 5.49 in | 6.56 in | 8.47 in | 10.4 in | 12.4 in | 14.7 in | 15.9 in | 17.5 in | 18.3 in |
100-yr | 1.17 in | 1.87 in | 2.32 in | 3.23 in | 4.4 in | 6.18 in | 7.49 in | 9.82 in | 12.2 in | 14.7 in | 17.5 in | 18.8 in | 20.3 in | 21.1 in |
For complete precipitation data including all durations, visit the NOAA PFDS
Rainfall Intensity (for Rational Method)
- 10 yr, 5 min: 9.72 inches/hr
- 25 yr, 5 min: 11.44 inches/hr
- 100 yr, 5 min: 14.04 inches/hr
Precipitation Visualizations
Intensity-Duration-Frequency (IDF) Curves

Precipitation Summary

100-Year Design Storm Hyetograph

Regulatory Analysis
Jurisdictional Overview
- Federal: FEMA, USACE (if wetlands present)
- State: Texas
- County: Wharton
- City: Unincorporated area
Permit Requirements
Research conducted: 2025-09-08T14:02:56.310656
Based on the jurisdiction analysis for Wharton County, Texas, here are the EXACT requirements for your 100.0-acre site in Zone AE:
1. STATE-LEVEL PERMIT REQUIREMENTS
Texas Commission on Environmental Quality (TCEQ)
- Agency: Texas Commission on Environmental Quality
- Construction General Permit: TPDES Construction General Permit (TXR150000) - REQUIRED for 100-acre site
- Threshold: 1 acre or more of disturbance (your site exceeds this)
- Notice of Intent (NOI) must be filed electronically via STEERS system
- Stormwater Pollution Prevention Plan (SWP3) required on-site
- State Stormwater Management: Incorporated into Construction General Permit
- Erosion Control: Part of TXR150000 requirements
- Wetland Permits: No state wetland program; federal Section 404 applies
- Professional Requirements:
- PE required for certain hydraulic calculations
- No state RLD certification program
- State Fees: $325 for Construction General Permit NOI
- Timeline: 7-day waiting period after NOI submission
- Applications: Submit via STEERS at www2.tceq.texas.gov/steers/
IMPORTANT: I cannot provide verified current phone numbers or email addresses. Please search "TCEQ Region 12 Houston" for the regional office serving Wharton County.
2. LOCAL PERMIT REQUIREMENTS
Wharton County Requirements
- Floodplain Development Permit - REQUIRED for Zone AE
- Form: Contact Wharton County Engineer's Office for current application
- Submittal: Typically 3 paper copies + 1 digital
- Scale: 1"=100' or larger for site plans
- Fees: Contact County Engineer for current fee schedule
- Review Timeline: Typically 2-4 weeks
VERIFICATION NEEDED: Contact Wharton County Engineer's Office directly for:
- Current permit application forms
- 2024/2025 fee schedule
- Exact submittal requirements
3. PERMIT SEQUENCING AND COORDINATION
- First: Obtain Wharton County Floodplain Development Permit
- Second: File TCEQ TPDES NOI (at least 7 days before construction)
- No combined application - separate submissions required
- Total Timeline: 3-5 weeks minimum for complete permit package
4. TECHNICAL CALCULATIONS
State Requirements (TCEQ):
- Methodology: No specific state methodology mandated
- Software: No specific software required by state
- Storm Events:
- 2-year for temporary erosion controls
- 25-year for permanent BMPs
Local Requirements (Wharton County):
- Methodology: Unit hydrograph method REQUIRED for 100-acre site (exceeds 200-acre threshold for Rational Method)
- Software: HEC-RAS commonly accepted for floodplain analysis
- Storm Events:
- 100-year storm for detention design (Zone AE requirement)
- Pre-development vs post-development comparison required
Precipitation Data:
CRITICAL VERIFICATION NEEDED:
- NOAA Atlas 14 values provided (100-year, 24-hour: 14.7 inches) should be verified with County Engineer
- Ask specifically: "Does Wharton County accept NOAA Atlas 14 values or require local IDF curves?"
- Storm distribution: Verify if Type II or Type III required
5. DESIGN STANDARDS
State BMP Standards:
- Reference: TCEQ RG-348 (technical guidance)
- No mandatory state BMP manual
Local Standards for 100-Acre Site in Zone AE:
- CRITICAL FREEBOARD REQUIREMENT:
- Wharton County: 1 foot above Base Flood Elevation (per Flood Damage Prevention Order)
- This meets FEMA minimum for Zone AE
- VERIFICATION NEEDED: Confirm current freeboard requirement with County Engineer
- Detention: 100-year post-development release rate ≤ pre-development rate
- Foundation Requirements: Elevation Certificate required for structures in Zone AE
- Fill Requirements: Compensatory storage may be required in Zone AE
6. SUBMITTAL DETAILS
State (TCEQ):
- Electronic submittal via STEERS
- PE certification required for certain elements
- SWP3 kept on-site, not submitted
Local (Wharton County):
- Plan sheets typically include:
- Cover sheet with project data
- Existing conditions/topography
- Proposed grading plan
- Drainage area map
- Hydraulic calculations
- Erosion control plan
- Details and specifications
- PE seal required on drainage plans
- Digital format: PDF typical, verify current requirements
7. STATE AGENCY CONTACTS
SUGGESTED SEARCH TERMS (I cannot provide verified current contact info):
- "TCEQ Region 12 Houston office"
- "TCEQ stormwater permits contact"
- "Texas floodplain management program"
8. LOCAL CONTACTS AND RESOURCES
SUGGESTED SEARCH TERMS:
- "Wharton County Engineer's Office"
- "Wharton County floodplain administrator"
- "Wharton County development permits"
CRITICAL ACTIONS FOR YOUR 100-ACRE ZONE AE SITE:
- Contact Wharton County Engineer immediately to verify:
- Current freeboard requirement for Zone AE
- Acceptance of NOAA Atlas 14 precipitation data
- Specific application forms and fees
- Compensatory storage requirements for fill in Zone AE
- Prepare for TCEQ TPDES permit:
- Register for STEERS account
- Prepare SWP3 document
- Budget $325 for state permit fee
- Design considerations specific to your site:
- Use unit hydrograph method (required for 100 acres)
- Design for 100-year storm event
- Ensure 1-foot freeboard minimum above BFE
- Plan for potential compensatory storage if placing fill
Additional Jurisdictional Information
Based on my research of hydrological permitting requirements for Wharton County, Texas:
1. STATE-LEVEL REGULATORY AGENCIES
- Primary state environmental agency: Texas Commission on Environmental Quality (TCEQ)
- Stormwater management: TCEQ Water Quality Division handles the Texas Pollutant Discharge Elimination System (TPDES)
- State-level permits required:
- TPDES Construction General Permit (TXR150000) for construction activities
- TPDES Multi-Sector General Permit for industrial facilities
- TPDES Municipal Separate Storm Sewer System (MS4) permits
- Erosion and sediment control: Incorporated into TPDES Construction General Permit requirements
- State wetland program: No state-specific wetland protection program; relies on federal Section 404 permits
- Water quality standards: Texas Surface Water Quality Standards (30 TAC Chapter 307)
2. STATE REGULATORY REQUIREMENTS
- Construction stormwater permits: Yes, TPDES Construction General Permit required
- Disturbed area threshold: 1 acre or more (same as federal)
- BMP standards: Technical guidance in TCEQ's "Complying with the Edwards Aquifer Rules" (RG-348) serves as statewide reference
- Freeboard requirements: No state-mandated freeboard beyond local requirements
- Post-construction requirements: Required through TPDES permits for MS4 communities
- Professional certifications: No state-specific Responsible Land Disturber certification; Professional Engineer (PE) required for certain submissions
3. COUNTY/LOCAL REGULATORY STRUCTURE
- Wharton County:
- Wharton County Engineer's Office handles floodplain development permits
- No separate stormwater management district
- City of Wharton (if applicable):
- Public Works Department handles drainage issues
- May have separate requirements from county
- Key ordinances:
- Wharton County Flood Damage Prevention Order
- Local subdivision regulations
4. UNIQUE LOCAL REQUIREMENTS
- Freeboard: Wharton County typically requires 1 foot of freeboard above Base Flood Elevation
- Calculation methods: Rational Method for areas under 200 acres; unit hydrograph methods for larger areas
- Software: No specific software mandated, but HEC-RAS commonly accepted for floodplain analysis
- Design standards: County may reference TxDOT Hydraulic Design Manual for roadway drainage
5. STATE-LOCAL INTERACTION
- Permit sequence:
- Local floodplain development permit typically obtained first
- TPDES Notice of Intent (NOI) filed before construction begins
- Joint applications: No joint application process; separate submissions required
- Local vs. state: Local requirements often exceed state minimums for drainage design
6. TECHNICAL STANDARDS
State Requirements:
- 2-year storm for temporary erosion controls
- 25-year storm for permanent BMPs
Local Requirements:
- 10-year storm for residential streets
- 25-year storm for collector streets
- 100-year storm for detention design
- Runoff coefficients per local standards or TxDOT manual
- Pre- vs. post-development runoff rates must not increase
7. KEY DOCUMENTS TO REFERENCE
State Documents:
- TCEQ RG-348 (Technical Guidance)
- TPDES Construction General Permit TXR150000
- 30 TAC Chapters 213 (Edwards Aquifer) and 307 (Water Quality Standards)
Local Documents:
- Wharton County Flood Damage Prevention Order
- Wharton County Subdivision Regulations
- Local drainage criteria (if published)
- Floodplain Development Permit Application
- County fee schedule
WHAT WOULD SURPRISE AN OUT-OF-STATE ENGINEER:
- No state-level stormwater management act - Unlike states with comprehensive stormwater laws, Texas relies primarily on TPDES implementation
- Limited state design standards - No statewide stormwater BMP manual; local jurisdictions have significant discretion
- No state wetland program - Texas is one of few states without state-level wetland regulations
- County-level authority - In unincorporated areas, counties have limited regulatory authority compared to other states
- Edwards Aquifer rules - While not applicable to Wharton County, the Edwards Aquifer rules create a unique regional regulatory framework in other parts of Texas
Note: Specific requirements should be verified with Wharton County Engineer's Office and TCEQ, as regulations may have been updated.
Recommended Next Steps
- Verify Flood Zone: Confirm flood zone designation with local floodplain administrator
- Survey Requirements: Obtain professional survey with elevation data
- Preliminary Consultation: Meet with local planning/permitting department
- Engineering Analysis: Engage qualified engineer for required studies
- Permit Applications: Prepare and submit required permit applications
Data Sources
- Location Data: OpenStreetMap Nominatim
- Flood Zone Data: FEMA NFHL (public MapServer)
- Precipitation Data: NOAA Atlas 14 Precipitation Frequency Data Server
- Analysis Date: 2025-09-08 14:04:13
This report is for preliminary analysis only. All information should be verified with appropriate regulatory authorities before making development decisions.